Pillar · Design and delivery are one job

Thought Leadership

One argument, held plainly: the separation of design from delivery is the cause of most of what goes wrong on a building, and the industry has organised itself around it anyway.

Other pillars: Architecture & Design Leadership  ·  Investment & Value  ·  Market & Local Insight  ·  Process & Client Guide  ·  Sustainability

The split between designing and delivering is the problem.

A common arrangement in Australian practice is that one person wins the work and sets the concept, a documentation team draws it, and someone else administers the contract. Each hand-off is defensible on its own. Together they produce the condition every client eventually describes: the building that was sold is not quite the building that was built, and nobody present at the end was present at the beginning.

This is not a failure of competence. It is a structural consequence of treating design and delivery as separate activities that happen to concern the same project.

Documentation is where design either survives or does not.

An idea that cannot be drawn to the standard a builder tenders from is not finished. The decisions that determine whether a concept arrives intact are junction details, tolerances, consultant coordination and specification, and they are made during documentation, by whoever is doing the documentation.

If that is not the person who set the concept, then the concept is being interpreted rather than resolved. The interpretation may be good. It is still interpretation, and it happens hundreds of times across a set of drawings, each time without the reasoning that produced the original decision.

3iD documents in-house in Revit, with the senior people who set the design. That is the same workflow on a private house and on a Victorian state-authority brief, because there is no good reason to run two standards.

Continuity is a design tool, not a service level.

Marcus Oldham College is the clearest evidence of this in the practice's record. A campus masterplan was developed first, then the Learning Centre, then two stages of student accommodation, each continuing the architectural language of the one before. That continuity is not a matter of taste being consistent. It is the same people holding the reasoning across a decade, so each project begins from what the last one established rather than from a fresh reading of a drawing set.

Dr Simon Livingstone, who was Principal through that period, put the outcome plainly: the College and its surrounds were transformed over the decade, and the institution now has facilities its students, staff and community use. That result is a function of who stayed on the job.

Site presence is where the drawings meet the building.

Weekly site presence through construction is the default on a 3iD commission, and the people who attend are the people who drew the work. On a live institutional site that is not a courtesy. Deakin's Building LC was refurbished while the facility stayed in use, which puts staging, services isolation and trade sequencing in play every week. Those decisions cannot be made from an office.

Michael Stanley, the builder on a private residence, describes 3iD as having designed the home and acted as superintendent on the project, with communication that was clear, concise and timely. A builder saying the plans were good to work with is a more useful verdict on documentation than any amount of description of it.

What this means for a client choosing an architect.

The question worth asking at a first meeting is not what the practice has designed. It is who will draw it, who will attend site, and whether those are the same people who are in the room now. The answer is a structural fact about how the practice is organised, and it is easy to check.

The second question is what the practice will not claim. An architect who will say plainly that a number has not been measured, or that a scope cannot be priced until it is defined, is describing how they will behave when something is difficult later.

The counter-argument, stated fairly.

Specialisation exists for good reasons. A large practice can carry depth no small team can, and a documentation specialist may draw a better detail than a generalist principal. On very large projects, a single person holding the whole thing is not possible and pretending otherwise would be dishonest.

The position here is narrower than it may read. It is not that specialisation is wrong. It is that the hand-off itself is the risk, that the risk is almost never priced or disclosed, and that on the scale of work this practice does, up to around $20M, there is no good reason to accept it.

Frequently asked.

Who will I actually deal with on a 3iD commission?

Mike Nowson leads every first meeting and responds personally to first enquiries. The senior people who set the design document it and attend site through construction. Mike holds ARBV registration 51402 and BOAQ 6590 directly, and is an A+ member of the Australian Institute of Architects, member 31244, since 2006.

Does a small senior team limit project size?

It sets a ceiling, and the practice is clear about where it is. The record runs to complex briefs up to around $20M, including a $12M learning centre and a 2,300 square metre workplace fitout. Above that scale the honest answer is a different conversation about resourcing, not a bid.

Is contract administration included?

It is part of a standard commission rather than an optional extra, because the argument above only holds if the same people are present at the end. Weekly site presence through construction is the default.

Read more about contract administration →

The first meeting is about whether there is a fit. The Nominated Architect responds personally, and no fee proposal is issued until the scope is agreed.

Request a proposal →   Request a capability statement →   How we work →