How to engage an architect.

Most clients who come to an architect have done so before, but not for this kind of project. A council that has done dozens of road and drainage briefs is doing a new community building for the first time in a decade. A school that runs an annual maintenance program is making its first capital-works approach. A developer who has built apartments is taking on a heritage-overlay site. The mechanics of engagement change with each. What follows is a plain guide to how the work actually starts, runs and finishes, written for the person reading procurement documents at a desk, not for industry insiders.

Step 1. Before there is a brief.

The most useful work an architect does on a project often happens before a brief has been written. Feasibility, masterplanning and early strategic engagement let a client see options, rough costs, staging implications and the likely approvals path before committing to a funded program. For schools and councils this work usually informs a later capital submission. For developers it sizes the yield case. For private clients it confirms what the site will actually support. It is a small line item that saves much larger ones later, and 3iD takes it on as a standalone service.

Step 2. Writing the brief.

A good brief is short, decisive about what matters and honest about what is fixed. It states the budget envelope and what the contingency assumption is. It states the program, when occupation is needed and what intermediate milestones are real. It states the procurement model: lump-sum, ECI, construction management, GMP. It states the non-negotiables (the playing field, the heritage shed, the council frontage) and the things that can move (the orientation of the kitchen, the auditorium capacity tolerance). Architects work better against a tight brief than against an aspirational one. If the budget is uncertain, say so, and engage feasibility to resolve it.

Step 3. Procurement and engagement.

For councils, schools and government clients, engagement usually runs through a formal procurement framework, open EOI, panel arrangement, direct engagement under threshold, or a Schedule of Rates. 3iD works through these frameworks regularly. Familiarity with the language of procurement (response templates, conflict-of-interest declarations, insurances and proof of capability) is part of the practice's baseline rather than a learning curve. For developers, body-corporates and private clients, engagement is usually direct, a letter of offer, a fee proposal and an architect-client agreement against the ACA, AIA or RAIA model. Three pages, not thirty.

Step 4. The work, stage by stage.

Architecture projects run through the same sequence regardless of size or sector, and 3iD numbers it exactly as the fee proposal does, in four stages: 1. Schematic Design (1.1 discovery and brief, 1.2 feasibility, 1.3 schematic design, where the project is sized and tested and the architectural idea is set), 2. Design Development (2.1 town planning and DA, 2.2 design development, where the concept is resolved against engineering, services and approvals), 3. Documentation (3.1 contract documentation, 3.2 building permit, the construction drawings, schedules and specifications a builder can tender against), 4. Contract Administration (4.1 tender to price the work and select a contractor, 4.2 contract administration with the architect on site through the build, 4.3 defects liability after handover). On a 3iD commission the same senior team is in the room from stage 1 to stage 4. The team at the first meeting is the team on site through construction.

Step 5. Decisions, sign-offs and change management.

Every project asks the client to make decisions, about scope, about materials, about cost and program trade-offs. The architect's job is to frame those decisions clearly, time them when they are due, and document them when they are made. Late-stage changes are the most expensive kind of change, and the most common cause of overrun on commercial and institutional projects. A disciplined process front-loads decisions so the documentation phase is a translation exercise, not a re-negotiation.

Step 6. What clients should expect.

A clear fee, broken down by stage, with the deliverables of each stage stated. A schedule of meetings, not a vague "as needed". A single architect of record who is contactable and accountable. Drawings, reports and documentation issued against a stated revision protocol, so the version of the drawing on site is always the version that matches the contract. Site presence during construction calibrated to the project's size and complexity, with written observation reports that go on the record. And honest reporting when things are off-track, before they become impossible to recover.

What a fee proposal should contain.

A fee proposal from any reputable architect should state, on no more than two or three pages: the scope of services (what is in, what is out), the stage breakdown of the fee, the method (lump-sum, percentage of construction cost, hourly with cap, or a hybrid), what disbursements are included or excluded, the consultant team to be engaged and how they are coordinated, the program assumptions, the insurances carried by the architect, and the termination and dispute provisions. Anything longer is usually padded; anything shorter is usually missing something important. If a fee proposal does not name the senior person delivering the work, ask.

For councils and government clients.

Procurement compliance, conflict-of-interest declarations, insurances (PI, public liability, professional indemnity at the level the framework requests), proof of capability against the framework's evaluation criteria, and a written response that addresses each evaluation question in the order it is asked. 3iD has worked under City of Greater Geelong, VSBA, DELWP/DEECA and regional Victorian council procurement, plus Heritage Victoria's separate consent framework on heritage-overlay sites.

For schools and colleges.

Engagement usually runs through a school council or college board. Masterplanning is typically the first piece of work, followed by feasibility on a specific capital project, then funded design and documentation. Funding submissions (Capital Improvement, Building Better Regions, Sport & Recreation Victoria, philanthropic) often require a feasibility-grade design and cost plan as input. 3iD prepares this work to the standard funding bodies expect.

For developers and body corporates.

Engagement is faster but the discipline is the same. A clear feasibility, a defendable yield case, a defendable program, and documentation the contractor can tender against. 3iD's multi-residential, mixed-use and developer work is approached this way as default, and the full engagement model is on the developers page.

For private residential clients.

The mechanics are smaller but the principles do not change. A site visit before the brief is written. A clear fee proposal. A team of record. Stage-by-stage approvals so cost and scope are not negotiated in the last month of documentation. The work is led personally, there is no associate-handoff between concept and construction.

Frequently asked.

How long does an architectural project take?

For a fitout or small commercial commission, six to nine months from engagement to occupation. For a school or community building, eighteen months to three years depending on funding cycle. For a residential commission, twelve to eighteen months from first sketch to construction completion. The construction phase is usually less than half the elapsed time, the rest is design, documentation, consultant coordination and approvals. Compressing the front end almost always costs more on the back end.

How are architect fees structured?

Four common methods: lump-sum (fixed amount per stage), percentage of construction cost (typically 7-14% across commercial and residential commissions, lower as projects get larger), hourly with cap (used for early-stage feasibility), or a hybrid that uses lump-sum for documentation and percentage for construction administration. The right method depends on how well-defined the scope is at engagement. See the Investment & Value pillar for a detailed breakdown.

Do we need a brief before approaching an architect?

No. A short statement of what is wanted, the site, the budget envelope and the program is enough to start. The brief is often written with the architect during the feasibility stage. For councils, schools and developers this is the most useful piece of work in the early sequence.

Read more about discovery and the brief →

Who owns the drawings?

Copyright in the design drawings stays with the architect under standard Australian agreements; the client receives a licence to use them for the contracted project. The licence is unlimited for the as-built project. If the design is re-used on another site, a separate licence is usually negotiated. The model agreements from the AIA / ACA set this out plainly.

What insurances does the architect carry?

3iD carries professional indemnity insurance to the standard public-sector frameworks request, public liability insurance, and workers' compensation cover for staff. Certificates of currency are provided on engagement and on request. The Nominated Architect is Mike Nowson, ARBV (Victoria) and BOAQ 6590 (Queensland).

Can the architect coordinate the other consultants?

Yes. The architect is typically the lead consultant on a commission, coordinating structural, civil, services, hydraulic, landscape, planning, heritage and quantity-surveying inputs. On 3iD projects the consultant team is briefed, scheduled and resolved within the architectural workflow rather than handed off in isolation. This is part of how the documentation arrives integrated.

Where can I see your capability statement?

A capability statement covering sectors, registrations, insurances, named principals, recent projects and key clients is available on the capability page. A more detailed sector-specific capability statement is provided on request, write to inquiries@3idstudios.com.au stating the sector and the project type.

Next step

Discuss a project, tender, panel or capability statement.

For commercial, civic, multi-residential and developer commissions in Victoria, Brisbane and South-East Queensland. The Nominated Architect responds personally.

Request a proposal →   Request a capability statement →

Articles in this pillar.

In-depth pieces on briefing, fees, procurement and delivery, published as the practice writes them. Reach out for advance drafts on a specific topic.