Pillar · What actually makes a building perform

Sustainability

Most of what is sold as sustainability is specification. The performance is decided earlier, in the section and the plan, and the greenest decision is often to keep the building that is already there.

Other pillars: Architecture & Design Leadership  ·  Investment & Value  ·  Market & Local Insight  ·  Process & Client Guide  ·  Thought Leadership

Performance is designed, then specified. Rarely the other way round.

Sustainability is usually presented as a list of products: the panels, the battery, the rating. Those are real, and they are the last decisions, not the first. A building with an unresolved section and poor orientation can be loaded with equipment and still perform badly, because the equipment is correcting the architecture rather than completing it.

The decisions that set performance are the ones made before any product is selected. Which way the long section faces, where the glass is and how it is shaded, how air moves through the plan, how much thermal mass is inside the insulated envelope, and whether the building needs to be built at all.

The most sustainable building is often the one already standing.

Demolition spends the carbon already in a structure and then spends more replacing it. Where an existing building has sound bones, keeping them is usually the largest single reduction available on the project, and it is rarely counted that way.

Furphy Hall converts an existing industrial shed in the Little Creatures Brewery precinct in South Geelong into a multipurpose venue. Zinc Offices retains as much of the existing structure of a 1970s Geelong office building as the brief allowed while extending it for contemporary workplace patterns. Deakin University's Building LC was renewed rather than replaced: services, drainage and roofing resolved while the facility stayed in use. In each case the existing structure was the starting condition, not an obstacle.

At Aberfeldie Primary School the judgement went the other way, and for a reason worth stating. The existing Learning and Teaching Centre was termite-damaged and past repair, so it was replaced. The orientation it had established was kept.

Passive first, because passive does not fail.

A design decision keeps working for the life of the building. A system has a service life, a maintenance requirement and an owner who may or may not maintain it.

That is the argument for resolving ventilation, shading and insulation before specifying plant. At Aberfeldie, improved insulation and airflow mean less reliance on mechanical systems, which reduces running cost and reduces what can be neglected. In subtropical work the same reasoning puts cross-ventilation through the section before any glass is placed, and gives roof form and verandah depth work that would otherwise be done by air conditioning.

Material life is a sustainability decision.

A material that needs replacing twice in thirty years has been specified three times. On exposed coastal sites that is not hypothetical: salt and wind set the replacement cycle, and the specification either accounts for it or does not.

Fairhaven Residence is a low-maintenance holiday residence on steep coastal terrain, designed to minimise site disturbance and retain existing native vegetation while meeting bushfire compliance. The 13th Beach house is organised as a courtyard and resolved for low maintenance. Low maintenance here is not a convenience claim; it is the material decision that determines how much is consumed over the building's life.

What 3iD will and will not claim.

The practice does not publish performance ratings it has not measured, and does not describe a building as sustainable because it has a feature. Where a project reduced reliance on mechanical systems, retained an existing structure, or was detailed for a long replacement cycle, that is stated and the project is named. Where a number has not been measured, it is not asserted.

That restraint is itself the position. An industry that uses the word loosely has made it hard for a client to tell a performance claim from a marketing one, and the only useful response is to say what was done and let the building be checked.

Frequently asked.

Does sustainable design cost more?

The passive decisions usually cost nothing, because orientation, section and plan arrangement are free at concept. What costs money is correcting their absence later with equipment, or specifying materials for a long replacement cycle on an exposed site. The honest framing is that early design decisions are where the savings are, and they are only available early.

Read more about sustainable architecture →

Is it greener to renovate or to rebuild?

Usually to renovate, where the structure is sound, because demolition writes off the carbon already in the building and then spends more replacing it. Furphy Hall, Zinc Offices and Deakin Building LC were all adaptive reuse. The exception is a structure that is genuinely past repair, as at Aberfeldie Primary School, where the existing building was termite-damaged through the frame.

Do you work to a rating scheme?

Where a client or an authority requires one, yes, and it is coordinated as part of the documentation. Where none is required, the practice does not claim a rating it has not been assessed against. A scheme measures a building; it does not design one.

What is the single biggest performance decision on a house?

The section, taken together with orientation and glazing. Which rooms face which way, how high the ceiling is, where the glass is and how it is shaded. It is resolved in the first weeks of a commission and it cannot be meaningfully changed afterwards.

Sustainable design is part of the standard commission, not an add-on service. The first meeting is about the site and the brief.

Request a proposal →   Request a capability statement →   Sustainable architecture →

Articles in this pillar.

Pieces on passive design, adaptive reuse, material life and the difference between a building that performs and a building that is marketed as performing.