Design development.
Resolved, then approved.
The design developed in material, structure and detail, with interiors integrated and consultants coordinated, while the town planning application is prepared, lodged and run through to a decision.
You are at 2 Design development, stage 2 of four.
- 1.1Discovery & brief
A brief worth designing to.
- 1.2Feasibility
The concept and Cost Plan A: the business case.
- 1.3Schematic design
A tested design direction.
- 2Design development
An approval, and the process run for you.
This page - 3Documentation
A construction set that leaves nothing to interpret.
- 4Contract administration
The building, administered to final certificate.
Materials, consultants, then the approval.
Materials and detail
Materials and finishes are selected and the detailing that carries the architecture is developed: how materials meet, how the facade is composed, where openings sit and how shading works. Inside and outside are resolved together.
Interiors and consultants
Joinery, kitchens, bathrooms, storage, lighting and finishes are resolved as part of the architecture. Structural, energy, services and specialist consultants are engaged now, while the design can still absorb their advice.
The approval, run for you
The planning documentation is prepared to answer what the authority will ask. After lodgement the practice manages requests for information, referrals, objections, heritage advice and negotiation through to a decision.

What you receive
- A developed design: materials, finishes, interiors and key details.
- Consultant advice coordinated into the drawings.
- A town planning application, lodged and managed.
- A planning decision, in Victoria or Queensland.
Preparing planning drawings and running the approval are different jobs. 3iD does both.






Common questions.
Do you handle the planning process, or just the drawings?
Both. The documentation is prepared and the process is then managed on the client's behalf, through lodgement, any requests for further information, referral authorities and objections, to decision.
Do you work across both Victoria and Queensland?
Yes. The practice runs from studios in Geelong and Noosa and works across multiple local government areas in both states. The assessment pathways differ; the work of preparing for them does not.
Can you take on heritage-listed or coastal sites?
Yes. Furphy Hall was delivered with Heritage Victoria and a council heritage advisor, and the practice has taken sensitive coastal sites through state and local government negotiation.
Are interiors part of this stage or a separate service?
The architectural interior, joinery, storage, lighting approach and surface finishes, is developed here as part of the design. Interior design taken further than that, into furniture, styling and procurement, is a specialist service and is priced separately.
Read more about interior design →
What happens if the application is refused or called in?
The practice stays on it. Refusals, objections and referrals are part of the process this stage covers, and 3iD has negotiated outcomes with both state and local government. Where a review is the right path, the documentation prepared here is what it rests on.
How long does an approval take?
That is the authority's timeframe rather than the practice's, and it varies widely by council, by overlay and by whether the application attracts objections or referrals. The part 3iD controls is not adding avoidable rounds to it.
Beyond the standard drawings.
Standard presentation imagery is part of the design stages. Where a decision needs more, two services can be added at any point, priced separately and run from the same model: advanced visualisation (photoreal stills, walkthroughs, VR) for boards, committees and planning authorities, and interior design and furniture for fit-out, styling and procurement.
Begin a conversation.