Project feasibility,
compliance and site selection.
Exploring feasibility, compliance and site viability before money is committed. Move forward with a defensible case, or walk away with clear information.
Feasibility first: honest sizing before money is committed.
Front-end feasibility and yield testing is the most useful work an architect does on a developer's brief. Site testing, planning-framework analysis, indicative built-form options, indicative cost input, staging strategy, sized at capped hourly rates so the developer can move or walk away without sunk-cost pressure.
3iD's feasibility work is sized to be defensible: yield calculations checked against the planning framework, indicative costs cross-referenced against current builder rates, site constraints surfaced at the design stage rather than the approval stage. The deliverable is a feasibility-grade design with a defendable case attached.
- Site testing and planning-framework analysis.
- Indicative built form, yield checked against the framework.
- Cost input cross-referenced against current builder rates.
- Capped hourly rates, move or walk away without sunk cost.
Planning approval: talk to council early, lodge in the right order.
- Pre-lodgement engagement with council planning officers.
- Planning levers identified: use class, height, FSR, overlays, environmental constraints.
- Documentation sequenced to the approval pathway.
- Authority track record: Heritage Victoria, DELWP, state and local government.
DA strategy is part of the front-end work. Pre-lodgement engagement with council planning officers, identification of the planning levers (use class, height, FSR, overlay, environmental constraints), and a documentation sequence designed to address the approval pathway as efficiently as the brief allows.
City of Greater Geelong, regional Victorian council and Queensland local-government procurement frameworks are familiar terrain, as are Heritage Victoria and DELWP approvals. The practice has delivered through complex authority sequences (Furphy Hall via Heritage Victoria, At The Heads via state government and council approvals), the methodology travels into developer work.
Clean documentation a contractor can tender against.
Construction documentation is carried in-house in Revit BIM by the practice's senior team. The deliverable is a coordinated, audit-ready document set with consultants (structural, civil, services, hydraulic, planning, quantity surveying) coordinated under the architectural agreement, not handed to the client in isolation.
Tender management, builder pre-qualification, evaluation of returned tenders, and contract negotiation are part of the standard engagement. The discipline that produces clean documentation is the discipline that produces a clean tender process, fewer addenda, fewer RFIs, tighter price.
- In-house Revit BIM, documented by the senior team.
- Consultants coordinated under the architectural agreement.
- Tender management: pre-qualification, evaluation, contract negotiation.
- Fewer addenda, fewer RFIs, tighter price.
Developer work across multi-residential, mixed-use, commercial and hospitality.
The developer engagement model above applies across the practice's commercial family. Villawood Properties — 41 units delivered — is the anchor reference.
Sector depth: multi-residential & mixed-use · commercial · hospitality
Reference projects.

Marcus Oldham Accommodation 1.
Stage 1 accommodation upgrade within a coordinated 10-year campus masterplan. On-campus living is integral to the Marcus Oldham experience; rooms were designed to be bright, acoustically and thermally comfortable, supporting relaxation, reflection and study after intensive education and social activity. The architecture responds to the campus's early modern aesthetic and integrates with established landscaped gardens and outdoor spaces. A core design challenge was balancing quiet, reflective spaces with active socialisation areas, ensuring both privacy and community within the student residential experience.

Marcus Oldham Accommodation 2.
Stage 2 accommodation within the coordinated 10-year campus masterplan for Marcus Oldham. The project continues the architectural language and design principles established in Stage 1. Feedback from the first stage was minor, and the design team used it to refine room planning, layout and detailing for a stronger outcome. Patterned masonry is central to the expression, with decorative brickwork used to give the buildings character while remaining subtle. Finishes are robust and restrained, chosen for durability under continuous student use. As in Stage 1, the buildings integrate with the established landscaped gardens and outdoor spaces. The design balances privacy with openness and separates active social areas from quiet spaces for rest, reflection and study.

Cuzens Place.
Inner city site- with complex and unknown history- masonry fireplaces and Baltic floors to the old shop front appear to show small shop at front at front with a dwelling at the back that had bend subsequently added onto and n upper floor added on the back with a dwelling upstairs- Multiple layers of renovations/ and fit outs over the years- core deign problem stripping away the layers to show the old skeleton - whilst opening the space up to allow for a light . bright well ventilated professional office space, with resolved short stay accommodation above- The Mural a COGG initiative was developed in conjunction with commissioned artist. Lane facade to integrate greenery, disguise the garage door and create a strong architectural presence.

WorkSafe Geelong Headquarters.
Government workplace at scale, methodology directly relevant to developer-led commercial.




“In our business we require professionals who can deliver and we were extremely pleased with the timely delivery and intimate knowledge that Mike brought to our particular project. We have been working with Mike and have been very impressed with his professionalism, innovation, budget analysis and attention to detail. We continue working with Mike and his staff and can highly recommend 3iD Architecture as a most professional business.”Julian Perez · Development Manager, Villawood Properties
Common questions.
Do you size feasibility before brief is finalised?
Yes. Capped-hourly feasibility is offered as a standalone engagement. Site testing, planning analysis, indicative built-form options and cost input, sized so the developer can move or walk away without sunk-cost pressure.
What fee structure do you use for developer work?
Typically a hybrid: lump-sum for documentation against developer milestones (DA, Construction Certificate, tender award, practical completion), with a percentage component for construction administration. Detail in the Investment & Value pillar.
Can you handle complex authority sequences?
Yes. Furphy Hall delivered through Heritage Victoria. At The Heads through state government and council approvals. The methodology travels into developer work, pre-lodgement up front, defendable documentation through the middle, contract administration on the back.
Read more about design development and the planning approval →
Request a proposal or discuss a tender.
For developer-led commissions in Victoria, Brisbane and South-East Queensland. The Nominated Architect responds personally.