
Marcus Oldham Accommodation 2
Stage 2 student accommodation continuing the design language of Marcus Oldham's 10-year masterplan.
- Location
- VIC
- Builder
- Plan Group
Site and brief
The site held a dilapidated caretaker's residence on land the college had long underused. The prospect of housing here challenged early assumptions, but the outlook, amenity and relationship to existing accommodation and dining made the case. Once reconsidered, the location proved compelling. The building also closed the final leg of a U-shaped courtyard, creating sheltered, quiet outdoor space on the southern face where none had existed.



A place to pause
The accommodation precinct provides students with a considered alternative to the density and noise of the main campus. Each room is oriented to balance natural light with acoustic separation, so residents can work or rest without the hum of corridor traffic filtering through. Shared study spaces sit at the threshold between private and communal zones, offering a middle ground for those who need focus without complete isolation. Materiality reinforces the shift in pace: timber joinery and acoustic lining temper the hard surfaces typical of institutional buildings, absorbing sound and softening the feel underfoot. The precinct functions as a buffer, a place where students can step back from the intensity of the academic program and find the conditions for sustained concentration or genuine rest.



Constraints and coordination
The site presented overlapping constraints: existing structures at grade, a complicated fall across the block, and the civil works needed to resolve both. Each adjustment to one system triggered compliance questions in another, particularly around fire rating for this building class.
The construction process was fast-tracked to meet strict school start deadlines and funding requirements. This became an exercise in sequencing decisions so that earthworks, structure and services could lock in without forcing late revisions. Working closely with Plan Group, the team established a coordination routine that caught clashes early and kept the programme from stalling when approvals required additional documentation.



Other work by the practice.

Marcus Oldham Accommodation 1
Stage 1 accommodation upgrade within a coordinated 10-year campus masterplan. On-campus living is integral to the Marcus Oldham experience; …

Deakin University Building LC
Significant internal and external refurbishment of existing research and admin facility- renewing and reinvorgating the existing facility, r…

Jokers Hotel
Refurbishment of an existing hospitality venue in central Geelong to create a contemporary outdoor sports lounge. The design reconfigures in…
Discuss a project, tender or capability statement.
For commercial, civic, multi-residential and developer commissions in Victoria, Brisbane and South-East Queensland. The Nominated Architect responds personally.