Deakin University Building LC
Complete refurbishment of research and administration facility including roof replacement, services renewal and internal reconfiguration.
- Location
- VIC
Site and brief
The existing facility, built in the late 1980s, had reached the end of its service life. Roofing, waterproofing and facade elements required wholesale replacement, and site drainage needed rationalisation to meet current standards.
The brief called for a complete internal and external refurbishment that would renew and reinvigorate the research and administration building while maintaining operations throughout. The challenge was to strip back and rebuild the envelope, upgrade services, and resolve long-standing water ingress issues without displacing staff or halting the work of the facility.



A renewed research facility
The refurbishment renews the building's interior and exterior while the site remains operational. New roofing replaces the existing structure, and rationalised drainage resolves longstanding water management issues across the precinct.
The outcome brings the research and administration facility into line with the broader quality of Deakin's Waurn Ponds campus. Staff move through upgraded spaces without the interruptions of staged closures or decanting, and the building continues to support its daily program throughout the works.



Working within a live facility
The existing research and administration building remained fully occupied throughout construction, which shaped every decision about sequence and access. External envelope works, including complete roof replacement and drainage rationalisation, proceeded in carefully staged zones to maintain weather protection over active areas at all times. Construction methodology prioritised containment: scaffolding systems were designed to support temporary weather barriers, allowing sections of cladding and roofing to be stripped back and rebuilt without exposing occupied floors below. Phasing was calibrated to research schedules and operational requirements, with each zone sealed and tested before the next opened. The result maintains continuity for the building's users while delivering a comprehensively renewed facility.



Other work by the practice.

Rosehill Secondary College
Rosehill Secondary College delivers a diverse curriculum with a focus on art, music and the performing arts. This new facility creates a cen…

Aberfeldie Primary School
Old Termite ridden LTC building at end of life- modest budget and the desire to open up, improve accoustics, improved sustainability and the…

3iD Offices
Inner city site- with complex and unknown history- masonry fireplaces and Baltic floors to the old shop front appear to show small shop at …
Discuss a project, tender or capability statement.
For commercial, civic, multi-residential and developer commissions in Victoria, Brisbane and South-East Queensland. The Nominated Architect responds personally.