Stage 4 of the fee proposal

Contract administration.
On site until it is finished.

Builder selection and tender, the building contract administered through construction, and the defects liability period after handover.

Produces The completed building Runs to Final certificate
The four stages of a commission

You are at 4 Contract administration, stage 4 of four, the last.

  1. 1.1Discovery & brief

    A brief worth designing to.

  2. 1.2Feasibility

    The concept and Cost Plan A: the business case.

  3. 1.3Schematic design

    A tested design direction.

  4. 2Design development

    An approval, and the process run for you.

  5. 3Documentation

    A construction set that leaves nothing to interpret.

  6. 4Contract administration

    The building, administered to final certificate.

    This page
What happens at this stage

Tender, build, hand over, then defects.

Tender and builder selection

Builders are pre-qualified and three to five are invited to tender on the same information. Submissions are compared in a tender report covering inclusions, exclusions and provisional sums, with a recommendation. Negotiated or early-contractor routes are used when the programme needs it.

Construction

3iD administers the contract as architect and as your representative: site meetings, typically fortnightly; answers to the builder's questions; shop drawings reviewed; variations and claims assessed; progress certified and workmanship monitored.

Completion and defects

Inspections establish practical completion, outstanding items are listed and the handover documents collected. Through the defects liability period, typically twelve months, defects are followed up and rectified before the final certificate.

What you receive

  • A tender report and recommendation.
  • Contract administration and site meetings through construction.
  • Practical completion, with manuals, warranties and certificates handed over.
  • Defects followed through to the final certificate.
Construction · slab, steel, roof

The senior team that designed the building is the team on site.

Frequently asked

Common questions.

Are you on site through construction?

Yes. Regular site inspections through to practical completion, by the senior team that designed and documented the building rather than a separate delivery group.

Is the defects liability period included?

Yes. It is routine contract administration, running after handover through to final certificate, and it is not a separately priced service.

Can the program be compressed?

Where a project needs it, through early contractor involvement and negotiated contract arrangements rather than a conventional tender. The practice has delivered staged and fast-tracked projects for institutions and government agencies.

How many builders do you put a project out to?

Usually three to five pre-qualified contractors. That is enough to compare price, capability and approach properly, and few enough that capable builders will commit the effort to price it.

What is in a tender report?

More than the prices. Inclusions, exclusions, qualifications, provisional sums, proposed alternatives and anything else affecting final cost or scope, plus an assessment of each contractor's methodology, experience and suitability, and a recommendation.

Read more about documentation and tender →

Who holds the building contract?

The client and the builder. 3iD administers that contract rather than being party to it, acting as architect and as the client's professional representative, which is what allows the assessment of claims and variations to be impartial.

Specialist services

Beyond the standard drawings.

Standard presentation imagery is part of the design stages. Where a decision needs more, two services can be added at any point, priced separately and run from the same model: advanced visualisation (photoreal stills, walkthroughs, VR) for boards, committees and planning authorities, and interior design and furniture for fit-out, styling and procurement.