Documentation.
Drawn so it is built as designed.
Construction documentation in BIM, coordinated with the engineers and services consultants, with building approval and certifier coordination running alongside. The largest stage, and the one that decides how much a builder has to interpret.
You are at 3 Documentation, stage 3 of four.
- 1.1Discovery & brief
A brief worth designing to.
- 1.2Feasibility
The concept and Cost Plan A: the business case.
- 1.3Schematic design
A tested design direction.
- 2Design development
An approval, and the process run for you.
- 3Documentation
A construction set that leaves nothing to interpret.
This page - 4Contract administration
The building, administered to final certificate.
Drawings, coordination, then approval.
Working drawings and schedules
Plans, elevations, sections and details drawn to construction standard, with door, window, finishes and joinery schedules and a specification, so the intended outcome is unambiguous.
Coordination in the model
The structural, services, energy and specialist consultants' documents are checked against the architectural set to find clashes and gaps. Found in the model a clash is a revision; found on site it is a variation.
Approval and issue
Building approval and certifier coordination run alongside the drawings rather than after them. Trade package documentation is included in the stage, and every issue is recorded in a drawing register.
What you receive
A full, comprehensive, coordinated set of construction documents: complete enough to be let as a lump sum tender and built under a fixed-price contract. Nothing is left to be priced as a provisional sum because it was never drawn, and nothing is left for a builder to interpret on site. The set comprises:
- General arrangement drawings: site plan, floor plans, roof plan, elevations and sections, fully dimensioned and levelled.
- Construction details, drawn where the building has to be built rather than described: junctions, thresholds, waterproofing, flashings and interfaces.
- A written specification covering materials, workmanship, standards and performance requirements, trade by trade.
- Schedules for doors, windows, finishes, joinery, fixtures, fittings and sanitaryware, so every item is nominated and priced.
- Reflected ceiling plans and electrical, lighting, data and switching layouts.
- Joinery and built-in cabinetwork documented in elevation and section.
- Consultant documentation coordinated into the set: structural, civil, hydraulic, mechanical, electrical, fire, acoustic and ESD, as the project requires.
- Trade package documentation, included in the stage rather than charged as an extra.
- The building approval documentation, coordinated with the certifier and the relevant authorities.
- The tender documents themselves, issued to your builders, with addenda and tender queries handled through the period.
The measure of a drawing set is how little it leaves for someone else to decide.






Common questions.
Is every project documented in BIM?
Yes. Every project is BIM-native in Revit from concept, so the documentation set is a view of the model the design was developed in rather than a separate redrawing.
Is trade package documentation an extra?
No. It is part of this stage. The practice produces it as a matter of course and it is not priced as a specialist service.
Who does the documentation?
Senior staff in-house, in both studios. The practice does not outsource documentation, which is what allows the team that designed the building to be the team answering questions about it on site.
How much am I involved during this stage?
Less than during design, and deliberately so. The major architectural decisions are already made. You will get progress updates and be asked for decisions where one is genuinely needed, but most of the work is technical.
Does the building approval happen here?
The building approval and certifier coordination run alongside the documentation rather than after it. Town planning approval is the earlier stage; this is the separate building-level approval.
Will the set be enough for a builder to price accurately?
That is the whole measure of it. A tender set that leaves gaps gets priced with assumptions and qualifications, and those become variations later. The objective is a set where every tenderer is pricing the same building.
Beyond the standard drawings.
Standard presentation imagery is part of the design stages. Where a decision needs more, two services can be added at any point, priced separately and run from the same model: advanced visualisation (photoreal stills, walkthroughs, VR) for boards, committees and planning authorities, and interior design and furniture for fit-out, styling and procurement.
Begin a conversation.
Mike responds personally within 48 hours.
