
Aberfeldie Primary School
Replacement of deteriorated relocatable with contemporary learning facility, improving performance and spatial flexibility.
- Location
- VIC
- Client
- VSBA
Site and brief
The existing Learning and Teaching Centre had reached the end of its serviceable life, its timber frame compromised by termite damage but the hardwood skeleton still sound enough to inform the new structure. The building's siting offered reasonable solar orientation, a starting point the brief asked us to build on. VSBA wanted a modest-budget intervention that would open up the interior, improve acoustics and thermal performance, and increase the flexibility of teaching spaces to reflect current pedagogy and technology. Because the building addresses the street, the client brief emphasised that any intervention must read as contemporary and aligned with the school's culture, not as a patch-up of an ageing asset.



A place to teach and be seen
The old building was termite-damaged and past repair. The brief called for better acoustics, thermal performance and flexibility on a tight budget, but also asked for something less measurable: that the school's street presence reflect how it actually teaches.
The new structure opens the plan to let classes spill and regroup. Acoustic treatments let a room hold focus or go quiet between sessions. Improved insulation and airflow mean less reliance on mechanical systems, and the layout adapts as the curriculum changes.
From the street, the building reads as current without chasing fashion. It signals that the school's methods have kept pace with how students learn now, not how they learned when the old hall went up.



Constraints and ambition
The building had reached the end of its serviceable life: termite damage through the structure, asbestos linings, and thermal performance that no longer met modern education standards. The budget was modest, and the brief called for adaptive reuse rather than replacement, aiming to extend the structure's working life by another 40 to 50 years. That longevity depended on designing for flexibility from the outset, so the fitout could adapt as teaching methods and technology shifted over the decades. The building also addresses the street, and the school wanted the facade to reflect its ethos and culture, so the architecture had to signal a modern institution without overstating the available funds. Balancing these constraints meant every material choice and spatial move had to carry multiple returns: acoustic improvement, thermal upgrade, visual coherence and future adaptability within a single intervention.



Other work by the practice.

Rosehill Secondary College
Rosehill Secondary College delivers a diverse curriculum with a focus on art, music and the performing arts. This new facility creates a cen…

At The Heads Bar and Restaurant
A heritage building on the Barwon Heads foreshore receives expanded function facilities and modernised service areas while respecting the si…

3iD Offices
Inner city site- with complex and unknown history- masonry fireplaces and Baltic floors to the old shop front appear to show small shop at …
Discuss a project, tender or capability statement.
For commercial, civic, multi-residential and developer commissions in Victoria, Brisbane and South-East Queensland. The Nominated Architect responds personally.