Interior staircase with timber panelling, metal railings, potted plants, and recessed lighting
Commercial · VIC

Zinc Offices

Refurbishment and extension of a 1970s Geelong office building for contemporary workplace patterns.

Location
VIC
Client
Zinc QS
The site and the brief

Site and brief

The existing building is a two-storey 1970s office on a main commercial street in Geelong, set between neighbouring shopfronts. The client required a workplace that could compete with working from home, giving staff a reason to leave the kitchen table: social connection with the same practical comfort they have in their own loungeroom. The brief called for an environment that reflects the company's culture, supporting collaboration, openness and access to the directors. Internal transparency was to express that culture, with clear sightlines between work areas, meeting rooms and circulation.

A series of meeting spaces was required to double as team spaces, encouraging informal interaction between staff. The workplace also had to reinforce professionalism for clients and visitors. The client sought a healthy, invigorating environment that would lift staff morale and support retention. Flexibility was essential so the building could adapt as the business and ways of working change.

Modern multi-storey building facade with large signage, white columns, black railings, and planted greenery
Interior staircase with black treads and natural timber risers, metal handrail, and glazed upper level
Open-plan office with workstations, black framed glass partitions, linear ceiling lights, concrete flooring, potted plant.
The outcome

A workplace rebuilt for daylight and interaction

The street face was rebuilt as a rhythm of white rendered blades framing black steel-framed glazing, balconies and planter boxes, giving the building a legible identity in a mixed commercial strip. Inside, a central void lit by highlight windows brings daylight into the core of the plan. A black steel stair with oak treads and glass balustrades rises through this void, connecting the two levels and acting as the social spine of the office. Oak-panelled joinery wraps the stair and frames integrated planters.

Black-framed glazed partitions enclose meeting rooms and directors' offices, maintaining privacy for discussion while keeping sightlines open across the floor. Directors sit within this glazed network, visible and accessible to staff. The staff kitchen and meeting table share one space, finished in green joinery, an upholstered green acoustic wall and an oak table. Perforated acoustic ceiling tiles run throughout. The palette of oak, black steel, white walls and soft greens is restrained and durable. A rooftop solar array and EV charging reduce operating costs and support staff who drive electric vehicles.

Open office space with timber-clad stepped platform, glass staircase, work tables, and recessed ceiling lights
Double-height interior with timber wall panels, black-framed glass partition, ceiling fan, and floating staircase
Interior multi-level atrium with timber-clad walls, glass balustrades, and staircase connecting three floors
The challenges and considerations

Adaptive reuse and acoustic performance

The design retains and reintegrates as much of the 1970s structure as feasible, reducing demolition, waste and embodied carbon. The existing building had a deep plan with limited natural light. The new void, highlight windows and extensive glazing resolve this, bringing daylight well into the floor plate.

Acoustics required careful attention because of the open, glazed character of the workplace. Sound transmission between meeting rooms, offices and open work areas is controlled through partition and glazing specification. Reverberation is managed with perforated acoustic ceilings and upholstered wall panels, so the office remains comfortable during phone calls, meetings and focused work. Transparency had to be balanced against confidentiality, with frosted bands to glazing providing privacy at eye level without blocking light. The design reflects the ethos of the business while remaining adaptable, with layouts and services that allow rooms to change use as the company grows.

Long narrow kitchen corridor with light timber and dark cabinetry, recessed ceiling lights, person walking toward entrance door
Modern kitchen with sage green cabinetry, stacked black ovens, and white stone backsplash
Interior stairwell with black-framed glazing, timber panelling, potted plants, and ceiling fan visible above.
Related work

Other projects in this sector.

Next step

Discuss a project, tender or capability statement.

For commercial, civic, multi-residential and developer commissions in Victoria, Brisbane and South-East Queensland. The Nominated Architect responds personally.

Request a proposal → Capability & fees →

← Back to all work