Architecture & Design Leadership
The decisions that shape a building, orientation, material, weight and light, are made long before a wall goes up. This is how the practice resolves them, set against buildings that are standing.
Other pillars: Investment & Value · Market & Local Insight · Process & Client Guide · Sustainability · Thought Leadership
The decisions that matter are made early, and cheaply.
A building's performance is largely settled in the first few weeks of a commission, before any drawing looks like architecture. Where the building sits on the site, which way the long section faces, how high the floor is, where the circulation runs: these cost nothing to change at concept and almost nothing to get right. They cost a great deal to fix once documented, and cannot be fixed at all once built.
That is the whole argument for spending real time at the front of a project. The decisions with the longest consequences are the ones available when the least money has been spent.
Orientation is not a diagram, it is the plan.
Solar orientation gets drawn as an arrow on a site plan and then ignored when the plan is arranged for other reasons. It is only useful if the rooms that need light are the rooms that get it.
At Aberfeldie Primary School the existing Learning and Teaching Centre had one thing worth keeping, and it was not the building. Its siting offered reasonable solar orientation, so the replacement built on that rather than starting again on the geometry. At Indented Heads the site is a battle-axe block with north-facing views over the bay, which meant the architecture had to work across two orientations at once: the compressed arrival from the street, and the wide prospect beyond. Those are not competing requirements to be split; they are the plan.
Mass is read from the street, not from the drawing.
A building's apparent size has little to do with its floor area. It is decided by how the eye reads it from the footpath and from the neighbouring property.
Indented Heads sits within a neighbourhood character overlay. The response was not to reduce the brief but to break what could have read as a single mass into a composition of distinct forms, each scaled against the surrounding streetscape. Upper levels step back, the roofline varies, and materials change at those breaks. The house reads as separate pavilions rather than one large box, and appears smaller than its actual footprint. Rescode provisions shaped the envelope, but the real constraint was sequencing the basement excavation and the structural frame without disrupting the properties either side.
Material is a decision about time.
Choosing a material is choosing how a building will look in fifteen years, which is a longer conversation than how it looks at handover. Swan Bay Residence adapts mid-century modernism and the longhouse and courtyard types of agrarian architecture to a rural setting on the Bellarine. Those are not stylistic references. They are building types that have already been tested against Australian climate and rural land use, which is why they are worth adapting rather than inventing past.
The same reasoning runs the other way on existing buildings. Zinc Offices retains as much of a 1970s Geelong office building as the brief allowed, because the structure was sound and replacing it would have spent carbon and money to arrive at the same floor plate.
Acoustics, air and light are the parts people feel.
Clients describe buildings they like in terms of comfort, and comfort is mostly acoustic and thermal. These are the least photogenic decisions in architecture and among the most consequential.
The brief at Aberfeldie asked for better acoustics, thermal performance and flexibility on a modest budget, and for something less measurable: that the school's street presence reflect how it actually teaches. The resolved building opens the plan so classes can spill and regroup, treats the rooms so one can hold focus while another goes quiet between sessions, and improves insulation and airflow so there is less reliance on mechanical systems. Each of those is a decision a visitor would not name, and all of them are what the building feels like to be in.
Design leadership is carried through documentation, or it is not carried at all.
An idea that cannot be drawn to the standard a builder tenders from is not yet a design. The gap between a persuasive concept and a building that holds up is almost entirely documentation and coordination, which is why those are not back-office functions to be handed down.
3iD documents in-house in Revit, with the same senior people through construction who set the concept. On institutional work that matters more, not less: the Marcus Oldham Learning Centre was developed through a strategic campus masterplan, and two accommodation stages followed in the same architectural language because the same team carried it. Continuity is a design tool.
Frequently asked.
What is the most common design mistake on a first commission?
Starting the plan from the room list. A schedule of accommodation is an input, not an arrangement. Buildings that begin from the section, the orientation and the arrival sequence tend to accommodate the room list comfortably; buildings that begin from the room list often cannot be fixed later without moving a wall that is now structural.
Can a building be both contemporary and sit inside a character overlay?
Yes, and the overlay is usually about scale and rhythm rather than style. At Indented Heads the response to a neighbourhood character overlay was to break the mass into distinct forms scaled to the street, step the upper levels back and change material at the breaks. The architecture is unambiguously current and still reads as part of its street.
How much does orientation actually change running costs?
Enough that it is the first thing to resolve, though the honest answer is that it depends on the section, the glazing and the insulation working together. Orientation alone, with poor glazing or an unresolved section, returns little. That is why it is treated here as a planning decision rather than a sustainability feature.
Who makes these decisions on a 3iD commission?
Mike Nowson leads every first meeting and the concept, and the senior people who set the design document it and attend site through construction. Mike holds ARBV registration 51402 and BOAQ 6590 directly.
The first meeting is about the site, the brief and whether there is a fit. No fee proposal is issued until the scope is agreed.
Request a proposal → Request a capability statement → How to engage an architect →Articles in this pillar.
Pieces on the craft itself: section and orientation, mass and scale, material over time, and the decisions that are cheap early and expensive late.