Mooroolbark East Primary School
Masterplan and renewal of a 1970s campus, giving the school flexible learning environments and a new identity within its community.
- Location
- Mooroolbark VIC
- Client
- VSBA
A 1970s campus at end of life
Mooroolbark East Primary School occupied a campus built in the 1970s. The buildings were structurally sound but no longer served the school they had become. Asbestos linings, poor acoustics and a fixed-classroom plan made them unsuitable for contemporary teaching. The gymnasium was undersized and the campus lacked a coherent identity.
The brief asked 3iD to prepare a masterplan that would renew the campus rather than replace it. The existing buildings were to be reorganised as adaptable learning environments with stronger links between indoor and outdoor space. As the masterplan developed, the scope expanded to include a new multi-use gymnasium and a complete renewal of the school's visual identity, so the campus could read as one coherent place rather than a collection of dated buildings.



A campus remade
The masterplan reorganised the existing learning areas so that teachers are no longer bound to a single room and a single mode of teaching. Spaces now support whole-class instruction, small-group work and independent learning, and open to outdoor areas that operate as part of the teaching program. The multi-use gymnasium gives the school a large indoor space for physical education, sport and whole-school activity.
Colour and materials were used as a strategy rather than decoration. A renewed school identity, expressed at the entry and carried consistently into each learning area, ties buildings of different ages into one campus and helps students orient themselves. The renewal was extensive enough that the school is largely unrecognisable from its previous form, giving a long-established institution a contemporary presence in its community.


“I couldn’t be happier with the work 3iD did for our school and I’d highly recommend them to anyone.”Brant Kennedy, Assistant Principal, Mooroolbark East Primary School

Working within what was there
Renewing rather than replacing meant working within the structure, dimensions and services of 1970s buildings. The masterplan had to identify where the existing fabric could support new ways of teaching and where targeted change would deliver the greatest benefit for the budget available. The school remained in operation, so the works were planned in stages that allowed teaching to continue without displacing students or staff for extended periods.
Colour carried a risk of reading as decoration applied over old problems. The design treated it as a system, with consistent rules for how colour is used across buildings of different ages and functions. It ties the entry sequence to the learning areas and the new gymnasium, so that the campus now reads as a single, renewed school rather than a collection of separate upgrades.



Other projects in this sector.

Rosehill Secondary College
Rosehill Secondary College delivers a diverse curriculum with a focus on art, music and the performing arts. This new facility creates a cen…

Deakin University Building LC
Significant internal and external refurbishment of existing research and admin facility- renewing and reinvorgating the existing facility, r…

Aberfeldie Primary School
Old Termite ridden LTC building at end of life- modest budget and the desire to open up, improve accoustics, improved sustainability and the…
Discuss a project, tender or capability statement.
For commercial, civic, multi-residential and developer commissions in Victoria, Brisbane and South-East Queensland. The Nominated Architect responds personally.