
Furlong Park School for Deaf Children
Specialist teaching and learning spaces for deaf and hearing impaired children aged 4 to 12, including new flexible, visually stimulating classrooms.
- Location
- VIC
- Client
- VSBA
- Builder
- Raysett PTY LTD
A three-decade facility, reconsidered
Furlong Park was purpose-built for deaf and hearing-impaired students in the early 1990s. The original classrooms reflected the acoustic and visual priorities of that period, but three decades of shifts in technology, pedagogy and spatial practice had left them fixed in place. The brief called for a wholesale remodelling: existing teaching spaces were reconfigured to support contemporary specialist programs in art, science, music and PE, while a new block of general classrooms was added to lift flexibility and capacity across the school. Every room was reconsidered for how it supports both current practice and future change, turning a well-detailed but static facility into one that can adapt as the school's needs evolve.



Outcome
The new classroom block introduces natural light and cross-ventilation across teaching spaces designed around the acoustic demands of hearing-impaired students. Wall and floor linings draw on the school's emblem in restrained bursts of colour, giving younger students visual cues without overwhelming the rooms. Staff and support spaces are grouped to keep specialist programs running without crossing into general teaching areas. The early learning centre, built for four- to six-year-olds, integrates hearing augmentation throughout, so technology sits within the architecture rather than over it. Audiovisual presentation tools are wired to each room's layout, not retrofitted, which means teachers can move between direct instruction and group work without repositioning equipment or losing a child's sightline to the screen.


“They collaborated closely with the leadership team at Furlong Park School for Deaf Children to create a beautiful and functional space that truly meets the needs of our students and staff.”Lee Bullock

Structure, air and acoustics, integrated
The existing building was robustly constructed but sealed tight, with no provision for natural ventilation. Opening it up to air and light meant working within a structural grid designed for smaller rooms, not the flexible volumes the brief required. The music room presented its own demand: a customised system that amplifies acoustic vibration through the floor, so students register bass frequencies through touch, not hearing alone. Reconfiguring the classrooms without losing intimacy required a balance between openness and enclosure. Landscape became part of that equation, drawn into sightlines to soften the internal scale. Each specialist space holds its own character while the plan allows rooms to adapt as teaching programs shift term to term.



Other projects in this sector.

Rosehill Secondary College
Rosehill Secondary College delivers a diverse curriculum with a focus on art, music and the performing arts. This new facility creates a cen…

Aberfeldie Primary School
Old Termite ridden LTC building at end of life- modest budget and the desire to open up, improve accoustics, improved sustainability and the…

Deakin University Building LC
Significant internal and external refurbishment of existing research and admin facility- renewing and reinvorgating the existing facility, r…
Discuss a project, tender or capability statement.
For commercial, civic, multi-residential and developer commissions in Victoria, Brisbane and South-East Queensland. The Nominated Architect responds personally.