Good bones. A brief that
has moved on.
Major renovations, extensions and whole-house remodelling on existing homes. From heritage-sensitive interventions and period-house transformations to coastal reworkings where the bones are sound but the brief has moved on.
Keep what deserves keeping.
An existing house transformed to carry a new brief — the fabric worth keeping retained and made legible, the interventions doing the most work for the least disruption.
Every renovation starts with an honest audit: what is this house actually made of, what is worth keeping, and what has been layered over it? Years of accretion — lean-tos, re-cladding, partitions — usually hide a clear original structure. The design problem is as much subtraction as addition.
Newtown Residence 05 shows the method. A post-war dwelling was retained and upgraded through selective intervention — a new stair, light brought into the centre of the plan, the original structure kept and made legible — rather than demolished and replaced. The result reads as one house, not an old house with a new box behind it.
Extensions are judged by their join. Where new meets old is the hardest and most important detail in the project: it decides whether the house reads as a whole, and it is where structure, services, levels and waterproofing all collide. We detail the junction first, not last.
Period and heritage fabric is treated as material to work with, not around. A heritage overlay sets a process; it does not forbid good contemporary work. The intervention is designed to let the original building carry its own character while the new work carries the new brief — in the Barrabool Hills, that means extending a post-war farmhouse north to the views while its homestead keeps its place.
Whole-house remodelling is often the right scale. Kitchens and bathrooms date fastest, but the real gains are usually structural: re-planning the circulation, re-orienting living spaces to the sun, opening the section. One coherent project outperforms a decade of piecemeal upgrades, in cost as well as outcome.
The decision to renovate rather than rebuild is itself design work. The feasibility stage tests both honestly — what the existing fabric can carry, what the planning context rewards, and where the budget does the most good — before the commission commits either way.
How this work is done.
- Audit before design
The existing fabric is measured, opened up where necessary and assessed honestly — structure, services, levels and what previous decades have buried. Design starts from what is actually there.
- Subtract first
Stripping accreted layers back to the original structure is often the most powerful move in the project, and the cheapest. Addition comes after the house has been allowed to show what it is.
- Detail the join first
The junction of new and old carries the project — structurally, visually and practically. It is resolved at the start of design, not discovered during construction.
- Light and orientation do the heavy lifting
Most period plans are dark in the middle and face the wrong way. Re-orienting living space to the sun and bringing light into the plan's centre transforms a house before a single room is added.
- One coherent project
Renovation, extension and interiors are designed as a single commission with one contract and one team, so the house arrives at a whole rather than a sequence of patches.



What the commission covers.
- Major renovations and whole-house remodelling, re-planned, re-oriented and re-serviced as one project.
- Extensions, designed from the junction of new and old outward.
- Heritage and period work, overlays navigated and original fabric kept legible.
- Renovate-or-rebuild feasibility, both paths tested honestly before the commission commits.
- Coastal reworkings, sound houses on good sites brought up to a brief that has moved on.
- Structural re-planning, circulation, section and light rather than surface renewal.
- Interiors as one commission, joinery, finishes and furniture carried with the building work — see The Complete Home.
- Documentation and contract administration, in-house through construction, where existing-fabric projects earn their surprises.
Common questions.
Renovate or rebuild — how do you decide?
By testing both in feasibility. The existing fabric is audited, the planning context checked both ways, and the budget mapped against each path. The answer is project-specific; committing before that work is guessing.
Does a heritage overlay rule out contemporary work?
No. An overlay sets a process and a standard of care, not a style. Good contemporary intervention alongside legible original fabric is a well-trodden approval path — and usually a better building than imitation.
Why do you start with what to remove?
Because decades of accretion hide most houses. Stripping lean-tos and layers back to the original structure is often the most transformative and least expensive move in the whole project.
What is the hardest part of an extension?
The join. Where new meets old, structure, levels, services and waterproofing all collide, and the detail decides whether the house reads as one building. It gets designed first.
Can you renovate in stages?
It can be designed for — one coherent plan delivered in planned stages beats a sequence of disconnected projects. But a single contract is usually cheaper per outcome, and the feasibility work makes that trade-off visible before you choose.
Do you take on coastal renovations?
Yes — reworkings of sound coastal houses are a steady part of the practice, across the Bellarine, the Surf Coast, Noosa and the Sunshine Coast, where the site is excellent and the house has simply fallen behind the brief.
The rest of the residential work.
Begin a conversation.
Mike responds personally within 48 hours.





